Selected work from across the group — compliance-led, audit-ready, documented to the standard the Building Safety Act now expects of everyone. Named projects, real numbers, no adjectives doing the work.
Nine integrated systems, 4,864 devices, one Fleet Street campus. PC and Building Control sign-off on the same day. Now maintained by the team that built it.
Passive fire · HealthcareThree sites, six buildings, 14,200+ assets, 3,800 penetrations. Zero remedials at the first BSA inspection.
Fit-out · AMPM Building Services18,000 sq ft in fourteen weeks — three regulators sequenced through one programme, move-in date protected.
More case studies publish as jobs complete and clients sign off on naming. Project sheets and PQQ references travel on request: bids@ampm.co.uk.
The group operates on relationships built by Gemini AMPM since 1997 — including Mace (Bloomberg HQ, 40 Argyll Street, Peterborough Court), Arc Group, FirstPort, Equans and Tier-1 supply chains. The team, the audit framework and the operating posture are shared.